Tuesday 28 March 2017

The playground is continuing to progress.




They're putting the pipes in the ground for water so the students can play in the water. They have dug a lot of sand up in the playground. We think we are going to get wet in the water and have lots of fun.

Tuesday 21 March 2017

The New Equipment in the Playground



Wow! The new playground is almost finished. After the holidays, we'll be able to play on the new playground. The Weesaw and the Sway Fun Glider are new. We also have a water pump and some domes to step on.
It's going to be a new playground to play in.


By SHS 1 & 2


Tuesday 14 March 2017

The Playground is Taking Shape.




The playground is almost finished. They are building the flying fox and poles for the shade. We are going to fly on a flying fox and ride on the paths when it is finished. Everyone still can't wait for it to be finished.

Tuesday 7 March 2017

The New Path in the Kenwick School Playground








There's a new path being built on the oval. The path is for the new playground. We can ride bikes and walk on the new path. The men are pouring concrete from the trucks. They are smoothing out the concrete on the path. The new playground is going to be perfect.


written by SHS2